epd were commissioned to undertake the landscape design for a single industrial warehouse distribution building and associated infrastructure in Trafford Park.
Collaboration and Multidisciplinary Approach: 
epd worked closely with the client and all consultants as part of a large multidisciplinary team. This collaboration ensured that all aspects of the project were seamlessly integrated.

Project Phases
Inception through to handover and closeout (RIBA Stage 6): epd are involved in all stages of the scheme, from initial concept through to construction, handover and closeout. This includes:

  • detailed landscape designs and management plans for the two units and the associated infrastructure including off plot mitigation areas. The production of softworks and soiling specifications.
  • site supervision and signoff of the landscape works at Practical Completion (PC)
  • aftercare inspections throughout a 24 month defect period
  • signoff at the end of the defect period.
  • production of all As Built information to be handed over to the client and to form part of the health and safety file at the end of the contract.