Willen House
Project Overview
epd were commissioned to undertake the LVIA and landscape design for two warehouse industrial distribution buildings and associated infrastructure including the access road in Milton Keynes
Collaboration and Multidisciplinary Approach:
epd worked closely with the client and all consultants as part of a large multidisciplinary team. This collaboration ensured that all aspects of the project were seamlessly integrated.
Project Phases
Inception through to handover and closeout (RIBA Stage 6): epd are involved in all stages of the scheme, from initial concept through to construction, handover and closeout. This includes:
- Landscape and Visual Impact Assessment with addendum assessing another potential option for the site.
- detailed landscape designs and management plans for the two units and the associated infrastructure. The production of softworks and soiling specifications.
- site supervision and signoff of the landscape works at Practical Completion (PC)
- aftercare inspections throughout a 24 month defect period
- signoff at the end of the defect period.
- production of all As Built information to be handed over to the client and to form part of the health and safety file at the end of the contract.