Warehouse Distribution, Danehill, Reading
Project Overview
epd were commissioned to undertake the hard and soft landscape design for a single industrial warehouse distribution building at Danehill, Reading
Collaboration and Multidisciplinary Approach:
epd worked closely with the client and all consultants as part of a large multidisciplinary team. This collaboration ensured that all aspects of the project were seamlessly integrated.
Project Phases
Inception through to handover and closeout (RIBA Stage 6): epd where involved through detailed design to construction, handover and closeout. This includes:
- detailed hard and soft landscape designs (including amenity space) and management plans and the production of softworks and soiling specifications.
- site supervision and signoff of the landscape works at Practical Completion (PC)
- aftercare inspections throughout a 24 month defect period
- signoff at the end of the defect period.
- production of all As Built information to be handed over to the client and to form part of the health and safety file at the end of the contract.
- Further inspections for a 5 year period