epd were commissioned to undertake the landscape design for three warehouse industrial distribution buildings and associated infrastructure including the access road in Skelmersdale.
Collaboration and Multidisciplinary Approach: 
epd worked closely with the client and all consultants as part of a large multidisciplinary team. This collaboration ensured that all aspects of the project were seamlessly integrated.

Project Phases
Inception through to handover and closeout (RIBA Stage 6): epd are involved in all stages of the scheme, from initial concept through to construction, handover and closeout. This includes:

  • detailed landscape designs and management plans for all three units and the associated infrastructure. The production of softworks and soiling specifications.
  • liaison with the client and project team regarding footpath diversions.
  • the design of bespoke seating areas
  • site supervision and signoff of the landscape works at Practical Completion (PC)
  • aftercare inspections throughout a 24 month defect period
  • signoff at the end of the defect period.
  • production of all As Built information to be handed over to the client and to form part of the health and safety file at the end of the contract.